Hyderabad’s eastern region is set for a major road infrastructure boost. The Centre has approved the proposed LB Nagar-Hayathnagar double-decker elevated corridor for inclusion in the annual plan.
Hyderabad urban infrastructure
Hyderabad is set to improve traffic flow across its western IT corridor with a major infrastructure project at Triple IT Junction in Gachibowli. The ₹459 crore project includes three flyovers and a six-lane underpass. These developments aim to reduce congestion, improve connectivity, and provide smoother access to key IT and commercial destinations. Officials have targeted May 2027 for...
A new Vehicle Underpass (VUP) at My Home Avatar Junction in Cyberabad has opened to improve traffic flow and reduce congestion at one of the busy junctions connecting Hyderabad’s western growth corridors.
Hyderabad’s KBR Park road infrastructure plan is set for a major redesign, with the Telangana government replacing the earlier proposal of 14 structures with a single two-way elevated corridor.
Hyderabad is set for a major upgrade to its electricity infrastructure. The city has approved a revised ₹5,756 crore underground power cable network project. The project will cover four major circles in the Hyderabad Metro Zone.
Hyderabad is set to develop a ₹1,656 crore elevated corridor connecting Banjara Hills with Shilpa Layout in Gachibowli. The proposed 9-km project aims to reduce congestion and improve connectivity between key residential, commercial, and IT areas.
Hyderabad is entering a new phase of urban growth. Telangana plans to expand the city beyond its current urban limits. The state also plans to develop new economic centres across the region.
Hyderabad is set to see major improvements in its urban mobility with three key infrastructure projects under the H-CITI programme. With a combined cost of ₹242.72 crore, the projects aim to ease traffic, improve connectivity